top of page

SUMMARY OF EXPERIENCE

Dedication and Desire to Grow

Terrance provides strong, effective overall leadership and direction to the project team. In addition, Terrance is responsible for ensuring complete transparency and collaboration are implemented throughout the entire project. Finally, Terrance serves as a direct point of contact with professionalism and passion, ensuring delivery on safety, quality, and innovation.

1517680204194.jpeg
Summary of Experience: Welcome

EDUCATION

The UNIVERSITY OF KENTUCKY, College of Engineering
Lexington, Kentucky
Masters of Science in Civil Engineering with an emphasis in Construction Management
Graduated in 2005

The UNIVERSITY OF KENTUCKY, College of Engineering
Lexington, Kentucky
Bachelors of Science in Civil Engineering 
Graduated 2003

Summary of Experience: Text

CERTIFICATIONS

Professional Engineering License - 69097
LEED AP BD + C - 10400640 
Certified Florida General Contractor's License - 1525145

​

Summary of Experience: Text

COMMUNITY

Associated Builder and Contractors Board Member (2019 - Current)

Associated Builder and Contractor Membership Committee (2018 - 2019)

Member of Experimental Aircraft Association (2018 - Current)

EAA Young Eagles 

Leadership Tampa Bay Alumni - Class of 2018 - Present

Hidden Lake Airport Maintenance Committee (2021)

Suncoast Seals President ( 2014 - 2016) 

Circle of Hero's Moring Ball Replacement Project

Summary of Experience: Text
Tying Rebar.jpg

PROJECT EXPERIENCE

1050 Water Street , Tampa, FL | $161M | 788,000 SF

New Construction | 22-Story Residential Tower | 510 Units | 32,000 SF Ground-Floor Retail | Indoor/Outdoor Bar | Outdoor Kitchens | Rooftop Pool | Enclosed Cabanas | Rooftop Recreation Lawn & Terrace

​

Edition Hotel & Residences, Tampa, FL | $137M | 327,000 SF

Preconstruction | New Construction | 27-Story Marriott-Brand Tower | 172 Guest Rooms | 37 Cross-Branded Condominiums | Rooftop Pool | Indoor/Outdoor Bar & Restaurant | Spa & Fitness Center | Ground-Floor Retail

​

Gopher Resource / Envirofocus Tampa Battery Smelter & Reycling Plant,Tampa, FL | $94M | 300,000 SF

Addition & Renovation | Operational Site | New Battery Smelting Facility | LEED Gold Hygiene Building | Wastewater Treatment Plant | Bag House | Torit Filtration System | Reverb Furnace Area | Plastic Recycling Facility

​

Envirofocus Technologies - New Hygiene Building, Tampa, FL | $5.2M

Administration Building for Manufacturing Facility | Clean Space Environments | Laboratories

​

Madico Transitions Site, Pinellas Park, FL | $9.5M

Modified Existing Transitions Manufacturing Facility to Accommodate New Manufacturing Lines for Madico Window Tint Production Equipment | Major Structural Modifications to Accommodate New Production Line Rooftop Mounted Equipment

​

Toyota Motor Manufacturing - Various Projects, Georgetown, KY | $20M

Body Weld Robotics Installations | Assembly Installations | Paint Installations

​

Toyota Motor Manufacturing - Powertrain Equipment Installation,  Huntsville, AL | $12M

Install Two Machining Equipment Assembly Lines | Head and Crank Machining Equipment

​

Toyota Motor Manufacturing - Quality Control Equipment Installation, San Antonio, TX | $5M

Installation of Sole Plate | Installation of Dynamometer | Installation of Laboratories | Miscellaneous Quality Control Equipment

​

St. Petersburg/Clearwater Airport - Phase III Terminal Renovation, Clearwater, FL | $8.5M

Addition of Two New Gates | Full Renovation | Security Upgrades | Active Airport | Ramp Modifications

​

St. Petersburg/Clearwater Airport - Customs & Border Protection Improvements, Clearwater, FL | $6.7M

 New Security Areas | Addition of New Baggage Area | Security System Upgrade | Secure Areas

​

Tampa International Airport - A&E Restroom Renovation, Tampa, FL | $5.1M

Renovation | Glass Artwork | Tiling | Back-Lit Mirrors | Partitions | Additional Fixtures 

​

​

University of South Florida - Misc. Projects, St. Petersburg, FL | $5M

Enhancements to Courtyard Area | Elaborate Water Features | Installation of Canopies | Statue Installation

​

Starkey K-8 School, Odessa, FL | $45.5M

New Construction | Tilt Wall | Enhanced Street Cleanup/Sweeping | Tight Schedule | Noise Restrictions

​

Pinellas Park Middle School - Renovation, Tampa, FL | $31M | 60,000 SF 

Renovation | Classrooms | Kitchen | Cafeteria | Extensive Canopies | Occupied Campus

​

Land O’ Lakes, FL | $28.5M

Renovation | Multi-Phased | Classrooms | Kitchen | Cafeteria | Entryway | Rounded-Room Layout | Occupied Campus

​

Starkey Elementary School - Addition, Seminole, FL | $3.4M

Addition | Classrooms | Tight Campus Layout | Tight Schedule

​

Starkey Theater, Library, & Cultural Center, Odessa, FL | $8.9M

New Construction | Design-Build | Tilt Wall | Starkey K-8 School Campus

​

Azalea Elementary School, St. Petersburg, FL | $3M

Addition | Classrooms | Tight Campus Layout | Tight Schedule

​

Pasco County Schools - Capital Improvements K-12 Renovations, Pasco County, FL | Value Undisclosed

Multiple HVAC Renovations | Envelope Rehabilitation Projects | Cabinet Replacements

​

Lee County Schools - IDA Baker HVAC Renovations, Cape Coral, FL | $7.6M  

New Chiller| New Cooling Tower | New Controls | New Piping | Tight Schedule |Occupied Site

 

Lee County Schools, Gateway (MMM) High School, Fort Myers, FL | $82M | 296,000 SF 

New Construction | Tilt Wall | Noise Restrictions| Classrooms | Kitchen | Cafeteria | Gymnasium | Theatre | Sports Fields | Concessions

 

Lee County Schools, Riverdale High School, N. Fort Myers, FL | $45M 

Preconstruction | Renovation | Multi-Phased | Classrooms | Kitchen | Cafeteria | Entryway | Rounded-Room Layout | Occupied Campus 

 

Lee County Schools - Estero (AAAA) K-8 New School, Estero, FL | $72 M

Preconstruction | New Construction | Tilt Wall | Classrooms | Cafeteria | Gymnasium| New Sports Fields | New CEP

 

Mease Life, Dunedin, FL | $1.2 M 

New Pool | Operational Site | Assisted Living Facility 

 

Mease Life, Dunedin, FL | $200 M

Preconstruction | Operational Site | Campus Repositioning | Three 5-Story Residential Tower | Parking plus 4 | Indoor / Outdoor Restaurants & Bars | Parking Facility| Renovations to Skilled Nursing

​

Pinellas County Public Works Continuing Contract, Pinellas County, FL | $2M

Reroof the Pinellas County Jail | Renovation Project at Eagle Lake Park | Renovation Project at Heritage Village Park

​

Pinellas County Public Works Keller Operations Center, Pinellas County, FL | $5M

Control Center for Drinking Water Distribution | Operations Control Room | Operation Offices

​

Tampa Bay History Center, Tampa, FL | $30M | 60,000 SF | LEED Silver

New Construction | Three Floors | Panoramic Views | Museum Store | 65-Seat Theater | Research Library | Exhibits

​

Clearwater Gas Systems, Clearwater, FL | $23.4M

New construction | Three-Stories | Lab Components | Collaboration Spaces | Challenging Site Constraints | Contaminated Site | Active Urban Campus

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Summary of Experience: Text
bottom of page